Scope: The scope of work included all activities required to perform the complete scope of supply, assembly, workmanship, manufacturing, internal testing, FAT staging, and packing in line with the project…
ITEC Energy successfully delivered a turnkey control and automation solution for the calorifier system at QatarEnergy’s headquarters. The scope included the supply of a custom-engineered PLC-based control panels designed to…
(280221900-WWTP-RLPP - Waste Water Treatment Plant for Camp Facilities)
Carried out the retrofit of the Building Maintenance Unit (BMU) at QP Towers, West Bay, integrating a Siemens S7-1200 PLC with Siemens V20 VFDs for precise motion control. A wireless…
Project: Fully automated Control System for Loading and Unloading Gas Gasoil and Gasoline Products Client: Ministry Of Petroleum, Sudanese Petroleum Corporation (MOP, SPC) Contactor: TETCO Sub-Contractor: Automate / ITEC
Overview Design, engineering, and supply of state-of-the-art HVAC control panels for the Ras Laffan Petrochemical Polyethylene plant, ensuring peak performance and reliability.
Technology Modicon M171, M172, and M173 logic controllers…