Skip to content Skip to footer

INTRODUCTION

Change the concept of an overall project
In our life cycle, we consider the production and construction subsystem, the maintenance and support
subsystem, and the focus on the retirement, phase-out, reuse, and disposal subsystem.
All the codes or the goals are respected within every step, from the need to the Product use and Disposal.

Identifying the need
  • Feasibility study
  • Needs Identification
  • System planning
  • Fundamentals analysis
  • Feasibility analysis
  • System Operational Requirements
  • Maintenance and Support concept
  • Performance measures
Preliminary Design
  • System functional analysis
  • Synthesis and allocation of design criteria
  • System and subsystem analysis
  • System synthesis and definition

Thinking about the end before the beginning of the production.

Detailed Design and Development
  • System and product design
  • System and product model development
  • System prototype test and evaluatio
Production and/or Construction
  • Product and system analysis assessment, and evaluation
  • Modifications for corrective action for product and/or process improvement
Product Use and Support
  • System assessment, analysis, and evaluation
  • Modification for correction and product improvement
Phase out and Disposal
  • Recycle
  • Waste
Utilization

Where training for the personnel is provided by our company At ITEC Energy, clients’ consent is of utmost importance. We ensure that by getting their approval before each decision is taken. Moreover, our goal is to give the clients the chance to optimize the product in any form or way they want, while ensuring sustainability, and environmental compliance, where we can reach up to 0% CO2 emission.