NFXP NFE ELICS – OFFSHORE TOPSIDES AND PIPELINES – EPCI (FAT)

Scope:The scope of work included all activities required to perform the complete scope of supply, assembly, workmanship, manufacturing, internal testing, FAT staging, and packing in line with the project specification drawings and documents .This included assembly of 15 Control Panels. Supply of all other accessories as required for 15 cabinets including MCBs, ducts, terminals, all required cables, fuses, air flow monitor, sockets, lugs, etc., ensuring all are LSZH cables and ducts, Supply of CAT6/FO patch cords.

EMPLOYER: Qatar Energy LNG
CLIENT: McDermott
SUBCONTRACTOR: Siemens W.L.L., Qatar
SUPPLIER: ITEC